Project Work July 2004
Extension Work
< July 2004 Civil's Week | 2005 works >
|
This photo, from the 340m chainage marker, was taken as work was winding up at the end of the project week. The week's work ended with the ballast reaching the 300m mark. In blue hats, James Hewett (left, our Chairman) removes the surveying traveller, which John Kerr (right, our Extension Coordinator) has been using to check the level. Dave Meller, driving the excavator, is the Chief Civil Engineer. The gang also included myself and three others, by rotation driving the two dumpers and the other excavator for loading ballast at Pen-y-Mount. The next photo shows the view in the opposite direction. Rick Beton | |
|