Project Weekend 6/7 December 2003
Extension Work
< 22nd/23rd November 2003 | Christmas 2003 >
|
Meanwhile, at the far end, the earthworks for the run-round loop are being completed. The surveying peg near-right shows where the trackbed will later widen as the loop branches off right. Mark Holden | |
|
754x435, 80KiB | |

