No.9 Siding Project
One of the tasks allocated for Civil's Week 2003 was to build a new siding into the former Civil Engineering Shed. This was to make new space for Carriage and Wagon repairs. There were already two sidings into the shed (Nos 5 and 6 Roads) and another was planned for use during the restoration of wagons and small coaches.
|
With the point mostly complete, the way into the shed was dug out and work started assembling the new siding within the shed. Rick Beton | |
|
393x593, 56KiB (large file: 787x1187, 185KiB ) | |