No.9 Siding Project
One of the tasks allocated for Civil's Week 2003 was to build a new siding into the former Civil Engineering Shed. This was to make new space for Carriage and Wagon repairs. There were already two sidings into the shed (Nos 5 and 6 Roads) and another was planned for use during the restoration of wagons and small coaches.
|
A length of straight rail is removed where the new turnout will be. Removing rusty old steelwork sometimes requires 'brutal persuasion'!. Rick Beton | |
|