Spring Bash 2003
P-Way Work
< July 2002 | 2003 at Rhdu Ddu >
|
The haul road is made simply from slate waste and will later form the sub-base for the ballast. Laying is a simple matter of excavating the topsoil, checking the cross-levels, spreading the slate waste, levelling it, checking the cross-levels, then rolling it firm. Rick Beton | |
|
595x397, 72KiB | |

