Civil's Week 2002
P-Way Work
< Spring 2002 | Easter 2003 >
|
A long shallow hole was needed. This is to take the sub-base below the new extension, consisting of 150mm slate waste and 150mm ballast. The hole had to be dug to accomodate the sub-base and also to lower the rail height to the level of Penmount lane crossing. Rick Beton | |
|
399x600, 60KiB | |